- No elements found. Consider changing the search query.
āļāļĢāļ°āļŠāļāļāļēāļĢāļāđ:
3 āļāļĩāļāļķāđāļāđāļ
āļāļąāļāļĐāļ°:
English
āļāļĢāļ°āđāļ āļāļāļēāļ:
āļāļēāļāļāļĢāļ°āļāļģ
āđāļāļīāļāđāļāļ·āļāļ:
āļŠāļēāļĄāļēāļĢāļāļāđāļāļĢāļāļāđāļāđ
- Responsible for planning preventive maintenance schedules for air condition & Fire protection systems.
- Responsible for coordinating and managing vendors and suppliers to preventive maintenance and payment plans.
- 2nd Level support to Data Center Operation (FOC), on site to solve Incident and Problem management.
- 2nd Level support to engineer team all site, Data Center (TT1, TT2, MTG, BNA).
- To create & update reports and documents to comply with ISO 20k, 22k, 27k, 50k & TCOS standards.
- Review PUE, cost saving energy and report.
- Measured Efficiency air system and record annual report.
- Responsible for implementation of Mechanical such as comfort air, precision air.
- Responsible for implementation of Fire suppression such as FM200, NOVEC, CO2, Fire Sprinkler, Fire Pump, Fire alarm, and Vesda.
- Working period office time 9:00 - 18:00 and able to standby on call or onsite to work on holiday.
- Bachelor degree of Engineering, Mechanical engineering or related field.
- At Least 3 years experience in maintenance air conditioning such as comfort air, precision air, chiller air cool, water cool, pump motor: implement and support for mechanics-air condition systems in buildings or Data Centers.
- At least 1 years experience in designing air conditioners such as comfort air, precision air, chiller air cool, water cool, pump motor: implement, and support for mechanics-air condition systems in building.
- Able to Air - Diagram and Psychrometric chart knowledge.
- Able to work as a team and work in and standby on call on holiday.
- Able to work overtime if required and a hotline arrives (Less than 1 hour on site from your home).
- Proficiency in English communication is beneficial.
- Work Location: TrueIDC - Bangna Site (KM26).
āļāļĢāļ°āļŠāļāļāļēāļĢāļāđ:
5 āļāļĩāļāļķāđāļāđāļ
āļāļąāļāļĐāļ°:
Electrical Engineering, Industrial Engineering, Mechanical Engineering
āļāļĢāļ°āđāļ āļāļāļēāļ:
āļāļēāļāļāļĢāļ°āļāļģ
āđāļāļīāļāđāļāļ·āļāļ:
āļŋ20,000 - āļŋ30,000
- āļ§āļēāļāđāļāļāđāļĨāļ°āļāļģāđāļāļīāļāļāļēāļĢāļāļģāļĢāļļāļāļĢāļąāļāļĐāļēāđāļāļīāļāļāđāļāļāļāļąāļ (Preventive Maintenance) āļāļąāļāļāļģāđāļāļāđāļĨāļ°āļāļ§āļāļāļļāļĄāļāļēāļĢāļāļģāļĢāļļāļāļĢāļąāļāļĐāļēāđāļāļĢāļ·āđāļāļāļāļąāļāļĢāđāļāđāļĨāļāđāļāļēāļĢāļāļĨāļīāļāļāļąāļāđāļāļĄāļąāļāļī āđāļāđāļ āļĢāļ°āļāļāļŠāļēāļĒāļāļēāļāļĨāļģāđāļĨāļĩāļĒāļ (Conveyor), āđāļāļĢāļ·āđāļāļāļāļĢāļĢāļāļļ (Packaging Machine), āđāļāļĢāļ·āđāļāļāļāļŠāļĄ (Mixer), āđāļĨāļ°āļŦāļļāđāļāļĒāļāļāđ (Robotics) āđāļāļ·āđāļāļĨāļāļāļēāļĢāđāļŠāļĩāļĒāđāļ§āļĨāļēāđāļāļāļēāļĢāļāļĨāļīāļ (Downtime).
- āđāļāđāđāļāđāļĨāļ°āļāđāļāļĄāļāļģāļĢāļļāļāđāļāļĢāļ·āđāļāļāļāļąāļāļĢ (Corrective Maintenance) āļ§āļīāđāļāļĢāļēāļ°āļŦāđāļŠāļēāđāļŦāļāļļāđāļĨāļ°āđāļāđāđāļāļāļąāļāļŦāļēāđāļāļĢāļ·āđāļāļāļāļąāļāļĢāļāļĩāđāļāļąāļāļāđāļāļāļāļĒāđāļēāļāļĢāļ§āļāđāļĢāđāļ§āđāļĨāļ°āļĄāļĩāļāļĢāļ°āļŠāļīāļāļāļīāļ āļēāļ āđāļāļ·āđāļāđāļŦāđāđāļĨāļāđāļāļēāļĢāļāļĨāļīāļāļāļĨāļąāļāļĄāļēāļāļģāļāļēāļāđāļāđāļāļēāļĄāļāļāļāļīāđāļāļĒāđāļĢāđāļ§āļāļĩāđāļŠāļļāļ.
- āļāļĢāļąāļāļāļĢāļļāļāđāļĨāļ°āļāļąāļāļāļēāļāļĢāļ°āļāļ§āļāļāļēāļĢ (Process Improvement) āļĄāļāļāļŦāļēāđāļāļāļēāļŠāđāļāļāļēāļĢāļāļĢāļąāļāļāļĢāļļāļāļāļĢāļ°āļŠāļīāļāļāļīāļ āļēāļāļāļāļāđāļāļĢāļ·āđāļāļāļāļąāļāļĢāđāļĨāļ°āļāļĢāļ°āļāļ§āļāļāļēāļĢāļāļĨāļīāļ āđāļāļ·āđāļāđāļāļīāđāļĄāļāļ§āļēāļĄāļāđāļēāđāļāļ·āđāļāļāļ·āļ (Reliability) āđāļĨāļ°āļĨāļāļāđāļāļāļļāļāļāļēāļĢāļāļĨāļīāļ.
- āļāļđāđāļĨāļĢāļ°āļāļāļŠāļāļąāļāļŠāļāļļāļāļāļēāļĢāļāļĨāļīāļ āļĢāļąāļāļāļīāļāļāļāļāļāļđāđāļĨāļĢāļ°āļāļāļāļĩāđāđāļāļĩāđāļĒāļ§āļāđāļāļ āđāļāđāļ āļĢāļ°āļāļāļĨāļĄāļāļąāļ (Compressed Air), āļĢāļ°āļāļāđāļāļāđāļģ (Steam), āđāļĨāļ°āļĢāļ°āļāļāļāđāļģāļŦāļĨāđāļāđāļĒāđāļ (Chilling System).
- āļāļąāļāļāļģāđāļāļāļŠāļēāļĢāđāļĨāļ°āļĢāļēāļĒāļāļēāļ āļāļąāļāļāļģāļĢāļēāļĒāļāļēāļāļāļēāļĢāļāđāļāļĄāļāļģāļĢāļļāļ, āļāļĢāļ°āļ§āļąāļāļīāđāļāļĢāļ·āđāļāļāļāļąāļāļĢ, āđāļĨāļ°āđāļāļāļŠāļēāļĢāļāļĩāđāđāļāļĩāđāļĒāļ§āļāđāļāļāļāļēāļĄāļĢāļ°āļāļāļāļļāļāļ āļēāļ āđāļāđāļ GMP, HACCP.
- āļāļĢāļīāļāļāļēāļāļĢāļĩ āļŠāļēāļāļēāļ§āļīāļĻāļ§āļāļĢāļĢāļĄāđāļāļĢāļ·āđāļāļāļāļĨ āļŦāļĢāļ·āļāļŠāļēāļāļēāļāļĩāđāđāļāļĩāđāļĒāļ§āļāđāļāļ.
- āļĄāļĩāļāļĢāļ°āļŠāļāļāļēāļĢāļāđāļāđāļēāļāļāļēāļĢāļāđāļāļĄāļāļģāļĢāļļāļāđāļāđāļĢāļāļāļēāļāļāļļāļāļŠāļēāļŦāļāļĢāļĢāļĄāļāļĒāđāļēāļāļāđāļāļĒ 2-3 āļāļĩ.
- āļŦāļēāļāļĄāļĩāļāļĢāļ°āļŠāļāļāļēāļĢāļāđāđāļāļāļļāļāļŠāļēāļŦāļāļĢāļĢāļĄāļāļēāļŦāļēāļĢ āļŦāļĢāļ·āļāđāļĢāļāļāļēāļāļāļĩāđāļĄāļĩāđāļĨāļāđāļāļēāļĢāļāļĨāļīāļāļāļąāļāđāļāļĄāļąāļāļīāļāļ°āđāļāđāļĢāļąāļāļāļēāļĢāļāļīāļāļēāļĢāļāļēāđāļāđāļāļāļīāđāļĻāļĐ.
- āļĄāļĩāļāļ§āļēāļĄāļĢāļđāđāļāļ§āļēāļĄāđāļāđāļēāđāļāđāļāļĢāļ°āļāļāđāļāļĢāļ·āđāļāļāļāļĨ, āļāļīāļ§āđāļĄāļāļīāļāļŠāđ (Pneumatics), āđāļĨāļ°āđāļŪāļāļĢāļāļĨāļīāļāļŠāđ (Hydraulics) āđāļāđāļāļāļĒāđāļēāļāļāļĩ.
- āļĄāļĩāļāļ§āļēāļĄāđāļāđāļēāđāļāđāļāļĢāļ°āļāļāļĄāļēāļāļĢāļāļēāļāļāļļāļāļ āļēāļāđāļĨāļ°āļāļ§āļēāļĄāļāļĨāļāļāļ āļąāļĒāđāļāļāļļāļāļŠāļēāļŦāļāļĢāļĢāļĄāļāļēāļŦāļēāļĢ (GMP, HACCP) āļāļ°āđāļāđāļāļāļĢāļ°āđāļĒāļāļāđ.
- āļŠāļēāļĄāļēāļĢāļāļāđāļēāļāđāļāļāđāļāļĢāļ·āđāļāļāļāļĨ (Mechanical Drawing) āđāļĨāļ°āļāļđāđāļĄāļ·āļāļāļēāļĢāđāļāđāļāļēāļāđāļāđ.
āļāļĢāļ°āļŠāļāļāļēāļĢāļāđ:
āđāļĄāđāļāļģāđāļāđāļāļāđāļāļāļĄāļĩāļāļĢāļ°āļŠāļāļāļēāļĢāļāđāļāļģāļāļēāļ
āļāļąāļāļĐāļ°:
English
āļāļĢāļ°āđāļ āļāļāļēāļ:
āļāļēāļāļāļĢāļ°āļāļģ
āđāļāļīāļāđāļāļ·āļāļ:
āļŋ15,000 - āļŋ22,000, āļĄāļĩāļāđāļēāļāļāļĄāļĄāļīāļāļāļąāđāļ
- āđāļŦāđāļāļēāļĢāļŠāļāļąāļāļŠāļāļļāļāļāļēāļāđāļāļāļāļīāļāđāļāđāļĨāļđāļāļāđāļēāđāļĨāļ°āļāļĩāļĄāļāļēāļāļ āļēāļĒāđāļ.
- āđāļāđāđāļāļāļąāļāļŦāļēāļāļĩāđāđāļāļĩāđāļĒāļ§āļāđāļāļāļāļąāļāļĢāļ°āļāļ POS āđāļĨāļ°āļāļēāļĢāļāđāļāļĄāļāļļāļāļāļĢāļāđ.
- āļāļĢāļ°āļŠāļēāļāļāļēāļāļāļąāļāđāļāļāļāļāļ·āđāļāđ āđāļāļ·āđāļāđāļŦāđāļĨāļđāļāļāđāļēāļāļķāļāļāļāđāļ.
- āļāļąāļāļāļģāļāļąāļāļāļķāļāļāļģāļāļāļĢāļąāļāļāļĢāļīāļāļēāļĢāđāļĨāļ°āđāļāļ§āļāļēāļāđāļāđāđāļāļāļąāļāļŦāļēāļāļĒāđāļēāļāļĨāļ°āđāļāļĩāļĒāļ.
- āļ§āļļāļāļīāļāļēāļĢāļĻāļķāļāļĐāļēāļĢāļ°āļāļąāļāļāļāļļāļāļĢāļīāļāļāļēāļŦāļĢāļ·āļāļāļĢāļīāļāļāļēāļāļĢāļĩ āļŠāļēāļāļēāđāļāļāļĩ āļŦāļĢāļ·āļāļŠāļēāļāļēāļāļĩāđāđāļāļĩāđāļĒāļ§āļāđāļāļ.
- āļĄāļĩāļāļąāļāļĐāļ°āļāļēāļĢāđāļāđāļāļąāļāļŦāļē āļāļēāļĢāļāļąāļāļāļēāļĢ āđāļĨāļ°āļāļēāļĢāļāļģāļāļēāļāļŦāļĨāļēāļĒāļāļĒāđāļēāļāļāļĢāđāļāļĄāļāļąāļāđāļāđāļāļĩ.
- āļĄāļĩāļāļ§āļēāļĄāļĢāļđāđāđāļāļĩāđāļĒāļ§āļāļąāļāļĢāļ°āļāļ POS āļŦāļĢāļ·āļāđāļāļāđāļāđāļĨāļĒāļĩāđāļāļāļĩāļāļ°āļāļīāļāļēāļĢāļāļēāđāļāđāļāļāļīāđāļĻāļĐ.
- āļŠāļēāļĄāļēāļĢāļāđāļāđāđāļāļĢāđāļāļĢāļĄ Microsoft Office (Excel, Word, PowerPoint) āđāļāđāļāļĒāđāļēāļāļāļĨāđāļāļāđāļāļĨāđāļ§.
- āļĄāļĩāļāļąāļāļĐāļ°āļāļēāļĢāļŠāļ·āđāļāļŠāļēāļĢāđāļĨāļ°āļĄāļāļļāļĐāļĒāđāļŠāļąāļĄāļāļąāļāļāđāļāļĩāđāļāļĩ.
- āļĄāļĩāļĢāļāļāļąāļāļĢāļĒāļēāļāļĒāļāļāđāđāļĨāļ°āđāļāļāļąāļāļāļĩāđ.
- āļĒāļīāļāļāļĩāļĢāļąāļāļāļąāļāļĻāļķāļāļĐāļēāļāļāđāļŦāļĄāđ.
- āļāļģāđāļĄāļāđāļāļāļŠāļĄāļąāļāļĢāļāļēāļāļāļąāļāđāļĢāļē?.
- āļĢāđāļ§āļĄāļāļēāļāļāļąāļ Office Design āđāļāļ·āđāļāđāļāđāļāļŠāđāļ§āļāļŦāļāļķāđāļāļāļāļāļāļĩāļĄāļāļĩāđāļĄāļļāđāļāļĄāļąāđāļāļŠāļĢāđāļēāļāļŠāļĢāļĢāļāđāđāļāļĨāļđāļāļąāļāļāļĩāđāļāđāļ§āļĒāđāļŦāđāļāļļāļĢāļāļīāļāđāļāļīāļāđāļ āļāļĢāđāļāļĄāđāļāļāļēāļŠāđāļāļāļēāļĢāļāļąāļāļāļēāļāļąāļāļĐāļ°āđāļĨāļ°āđāļāļīāļāđāļāđāļāļŠāļēāļĒāļāļēāļāļĩāļāđāļāļŠāļ āļēāļāđāļ§āļāļĨāđāļāļĄāļāļēāļĢāļāļģāļāļēāļāļāļĩāđāļŠāļĢāđāļēāļāļŠāļĢāļĢāļāđāđāļĨāļ°āđāļāđāļāļĄāļīāļāļĢ.
āļāļĢāļ°āļŠāļāļāļēāļĢāļāđ:
5 āļāļĩāļāļķāđāļāđāļ
āļāļąāļāļĐāļ°:
Procurement
āļāļĢāļ°āđāļ āļāļāļēāļ:
āļāļēāļāļāļĢāļ°āļāļģ
āđāļāļīāļāđāļāļ·āļāļ:
āļŠāļēāļĄāļēāļĢāļāļāđāļāļĢāļāļāđāļāđ
- Bachelor's Degree or equivalent practical experience.
- 5 years of experience in bidding, designing, operating, and commissioning of electrical systems.
- Experience with mission critical facility s electrical infrastructure systems.
- Knowledge of electrical systems commissioning.
- Knowledge of mechanical and control systems.
- Ability to travel internationally up to 25% of the time needed.
- Our thirst for technology is a part of everything we do. The Data Center Engineering team takes the physical design of our data centers into the future. Our lab mirrors a research and development department - cutting-edge strategies are born, tested and tested again. Along with a team of great minds, you take on complex topics like how we use power or how to run state-of-the-art, environmentally-friendly facilities. You're a visionary who optimizes for efficiencies and never stops seeking improvements - even small changes that can make a huge impact. You generate ideas, communicate recommendations to senior-level executives and drive implementation alongside facilities technicians.
- With your technical expertise, you ensure compliance with codes and standards, develop infrastructure improvements and serve as an expert in your specialty (e.g., cooling, electrical).
- As a Data Center Electrical Engineer, you will be involved in program level engineering projects and the modification of existing infrastructures. You will provide and prepare all types of documents including engineering reports, design documents, Total Cost of Ownership (TCO) analysis, drawing markup, budget, schedule, and more.
- In this role, you will also take project execution level responsibility in ensuring our facilities build execution meets project specific goals on safety, quality, schedule, and cost. You will provide guidance and leadership to all stakeholders involved in the project (e.g., AE, GC, S/C on mechanical discipline related issue to the resolutions).Behind everything our users see online is the architecture built by the Technical Infrastructure team to keep it running. From developing and maintaining our data centers to building the next generation of Google platforms, we make Google's product portfolio possible. We're proud to be our engineers' engineers and love voiding warranties by taking things apart so we can rebuild them. We keep our networks up and running, ensuring our users have the best and fastest experience possible.
- Collaborate with the core team to understand, develop and update the data center mechanical designs, starting from Basis of Design (BOD) to Issue for Constructions (IFC) documents, for data center project build-outs and major infrastructure upgrades to all levels of testing and commissioning works.
- Manage mechanical (power supply, monitoring, and control), support procurement in Statement of Work (SOW) preparation, bid technical clarification, be accountable for key mechanical equipment manufacturing monitoring, and deliver and install on site. Identify and resolve issues raised by the cross-functional teams.
- Update and maintain the internal design specifications, drawings, and standards in accordance with the latest configurations.
- Provide and prepare documents including statement of work, engineering reports, design documents, total cost of ownership analysis, drawing markup, budget, schedule, commissioning documents.
- Develop next generation mechanical system products to meet company long-term strategies.
- Google is proud to be an equal opportunity workplace and is an affirmative action employer. We are committed to equal employment opportunity regardless of race, color, ancestry, religion, sex, national origin, sexual orientation, age, citizenship, marital status, disability, gender identity or Veteran status. We also consider qualified applicants regardless of criminal histories, consistent with legal requirements. See also Google's EEO Policy and EEO is the Law. If you have a disability or special need that requires accommodation, please let us know by completing our Accommodations for Applicants form.
āļāļąāļāļĐāļ°:
SOLIDWORKS, AutoCAD, BIM
āļāļĢāļ°āđāļ āļāļāļēāļ:
āļāļēāļāļāļĢāļ°āļāļģ
āđāļāļīāļāđāļāļ·āļāļ:
āļŠāļēāļĄāļēāļĢāļāļāđāļāļĢāļāļāđāļāđ
- āļĢāļąāļāļāļīāļāļāļāļāļāļēāļĢāđāļāļĩāļĒāļāđāļāļāđāļĨāļ°āļāļāļāđāļāļāļāļīāđāļāļāļēāļāđāļāļĢāļđāļāđāļāļ 2D āđāļĨāļ° 3D āđāļāļĒāđāļāđāđāļāļĢāđāļāļĢāļĄ SolidWorks āđāļĨāļ° AutoCAD āđāļŦāđāļāļĢāļāļāļēāļĄāļāđāļāļāļģāļŦāļāļāđāļĨāļ°āļāļ§āļēāļĄāļāđāļāļāļāļēāļĢāļāļāļāļ§āļīāļĻāļ§āļāļĢ āļĨāļđāļāļāđāļēāđāļĨāļ°āđāļāļĢāļāļāļēāļĢ.
- āļāļĢāļ§āļāļŠāļāļāđāļĨāļ°āđāļāđāđāļāđāļāļāđāļŦāđāļāļđāļāļāđāļāļāđāļĨāļ°āļŠāļĄāļāļđāļĢāļāđāļāđāļāļāļāđāļāļŠāļĢāđāļēāļ.
- āļŠāļ·āđāļāļŠāļēāļĢāđāļĨāļ°āļāļĢāļ°āļŠāļēāļāļāļēāļāļāļąāļāļ§āļīāļĻāļ§āļāļĢ, āļāļĩāļĄāļāļēāļāļ§āļīāļĻāļ§āļāļĢāļĢāļĄ āđāļĨāļ°āļĨāļđāļāļāđāļēāđāļāļ·āđāļāđāļŦāđāļāļēāļĢāļāļģāđāļāļīāļāļāļēāļāđāļāđāļāđāļāļāļēāļĄāđāļāļāļāļēāļ.
- Responsibilities: āļĢāļąāļāļāļīāļāļāļāļāļāļēāļĢāđāļāļĩāļĒāļāđāļāļāđāļĨāļ°āļāļāļāđāļāļāļāļīāđāļāļāļēāļāđāļāļĢāļđāļāđāļāļ 2D āđāļĨāļ° 3D āđāļāļĒāđāļāđāđāļāļĢāđāļāļĢāļĄ SolidWorks āđāļĨāļ° AutoCAD āđāļŦāđāļāļĢāļāļāļēāļĄāļāđāļāļāļģāļŦāļāļāđāļĨāļ°āļāļ§āļēāļĄāļāđāļāļāļāļēāļĢāļāļāļāļ§āļīāļĻāļ§āļāļĢ āļĨāļđāļāļāđāļēāđāļĨāļ°āđāļāļĢāļāļāļēāļĢ.
- āļāļĢāļąāļāļāļĢāļļāļāđāļāļāđāļĨāļ°āļĢāļēāļĒāļĨāļ°āđāļāļĩāļĒāļāļāļāļāļāļīāđāļāļāļēāļāļāļēāļĄāļāļ§āļēāļĄāđāļŦāđāļāļāļāļāļ§āļīāļĻāļ§āļāļĢāđāļĨāļ°āļĨāļđāļāļāđāļē.
- āļāļąāļāļāļģāđāļāļāļŠāļēāļĢāļāļēāļĢāļāļķāđāļāđāļāļ āđāļĨāļ°āļĢāļēāļĒāļāļēāļāļāļ§āļēāļĄāļāļ·āļāļŦāļāđāļēāđāļāļāļēāļĢāđāļāļĩāļĒāļāđāļāļ.
- āļāļĢāļ§āļāļŠāļāļāđāļāļāđāļŦāđāļŠāļāļāļāļĨāđāļāļāļāļąāļāļĄāļēāļāļĢāļāļēāļāļāļēāļĢāļāļāļāđāļāļāļāļĩāđāļāļģāļŦāļāļ.
- āļāļģāļāļēāļāļĢāđāļ§āļĄāļāļąāļāļāļĩāļĄāļ§āļīāļĻāļ§āļāļĢāđāļĨāļ°āļĨāļđāļāļāđāļēāđāļāļāļēāļĢāđāļāđāđāļāļāļąāļāļŦāļēāļāļĩāđāđāļāļĩāđāļĒāļ§āļāđāļāļāļāļąāļāđāļāļ.
- Qualifications: āļŠāļģāđāļĢāđāļāļāļēāļĢāļĻāļķāļāļĐāļēāļĢāļ°āļāļąāļ āļāļ§āļŠ. āļāļķāđāļāđāļ āđāļāļŠāļēāļāļēāđāļāļĢāļ·āđāļāļāļāļĨ āļŦāļĢāļ·āļāđāļĄāļāļāļēāļāļĢāļāļāļīāļāļŠāđ.
- āļĄāļĩāļāļĢāļ°āļŠāļāļāļēāļĢāļāđāđāļāđāđāļāļĢāđāļāļĢāļĄ SolidWorks āđāļĨāļ° AutoCAD āļāļĒāđāļēāļāļāđāļāļĒ 1-2 āļāļĩ.
- āļĄāļĩāļāļ§āļēāļĄāļĢāļđāđāļāļ·āđāļāļāļēāļāļāđāļēāļāļāļēāļĢāđāļāļĩāļĒāļāđāļāļ āļ§āļīāļĻāļ§āļāļĢāļĢāļĄāđāļāļĢāļ·āđāļāļāļāļĨ āđāļĨāļ°āļĄāļēāļāļĢāļāļēāļāļāļēāļāļāļāļāđāļāļ āđāļāđāļ ISO, DIN.
- āļĄāļĩāļāļ§āļēāļĄāļĢāļđāđāļāļ§āļēāļĄāđāļāđāļēāđāļāđāļāļŦāļĨāļąāļāļāļēāļĢāļāļēāļāļāļĨāļĻāļēāļŠāļāļĢāđāđāļĨāļ°āļ§āļąāļŠāļāļļāļāļĩāđāđāļāđāđāļāļāļēāļāļ§āļīāļĻāļ§āļāļĢāļĢāļĄāđāļāļĢāļ·āđāļāļāļāļĨ.
- āļĄāļĩāļāļ§āļēāļĄāļĨāļ°āđāļāļĩāļĒāļāļĢāļāļāļāļāļ āđāļāđāđāļāđāļāļāđāļāđāļāļđāļāļāđāļāļ āđāļĨāļ°āļāļģāļāļēāļāļāļēāļĄāļāļģāļŦāļāļāđāļ§āļĨāļēāđāļāđāļāļĩ.
- āļŦāļēāļāļĄāļĩāļāļ§āļēāļĄāļĢāļđāđāļāļ§āļēāļĄāđāļāđāļēāđāļ āđāļĨāļ°āļāļąāļāļĐāļ°āļāļēāļĢāļāļģāļāļēāļāļāļāļĢāļ°āļāļ BIM āļāļ°āļāļīāļāļēāļĢāļāļēāđāļāđāļāļāļīāđāļĻāļĐ.
- SCG Cement and Green Solutions Business.
- 1
āļĒāļāļāļāļīāļĒāļĄ
āļĨāļāļāļāļģ 5 āļŠāļīāđāļāļāļĩāđāļŦāļĨāļąāļāđāļĨāļīāļāļāļēāļ āļāļĩāļ§āļīāļāļāļļāļāļāļ°āđāļāļĨāļĩāđāļĒāļāđāļāļāļĨāļāļāļāļēāļĨ
āļāļģāđāļāļ°āļāļģāļāđāļēāļāļāļēāļāļĩāļāļāļĢāļīāļĐāļąāļ 7 āđāļāļāļāļĩāđāļāļļāļāđāļĄāđāļāļ§āļĢāļāļģāļāļēāļāļāđāļ§āļĒ
āļāļģāđāļāļ°āļāļģāļāļēāļĢāļŦāļēāļāļēāļāđāļāļīāļāđāļāļĨāļŠāļļāļāļĒāļāļ 50 āļāļĢāļīāļĐāļąāļāļāļĩāđāļāļāļĢāļļāđāļāđāļŦāļĄāđāļāļĒāļēāļāļĢāđāļ§āļĄāļāļēāļāļāđāļ§āļĒāļĄāļēāļāļāļĩāđāļŠāļļāļ 2025
āļāđāļēāļ§āļŠāļēāļĢāđāļŦāļĄāđāđ
